Weekly Updates

LegiStorm is constantly adding new information on the people, places and reports in our database. In the past week, LegiStorm added:

  • 53 new people
  • 160 new organizations
  • 350 job history records for people in our database
  • 66 education records for people in our database
  • 96 contact addresses, emails and URLs (LinkedIn, Facebook, etc.)
  • 5 new people through the revolving door
  • 60 new policy reports
  • 28 new trips to our privately funded travel database
  • 97 new personal financial disclosures
  • 49605 new tweets
  • 7567 new press releases
 LegiStorm Blog
 SOCIAL MEDIA

 DEVBLOG
 IN THE NEWS
Few rules when foreign governments fund Congressional travel

by FOX 13 / WTVT-TV on 05/10/2013

Lawmakers' families bring home big perks

by Iowa Watchdog on 05/08/2013

Paying the Bills | Hill Navigator

by Roll Call on 05/07/2013

LegiStorm: Most new lawmakers want D.C. experience

by Planet Washington on 04/29/2013

Defense Acquisitions: Opportunities for the Army to Position Its Ground Force Modernization Efforts for Success - GAO Report

Date: March 10, 2010
Report No.: GAO-10-493T
Pages: 19
  Download  PDF Download PDF Now
Agency: Department of Defense: Department of the Army
Summary:

Since 2003, the Future Combat System (FCS) program has been the centerpiece of the Army's efforts to transition to a lighter, more agile, and more capable combat force. In 2009, however, concerns over the program's performance led to the Secretary of Defense's decision to significantly restructure and ultimately cancel the acquisition program. As a result, the Army is outlining a new approach to ground force modernization. This statement outlines the Army's preliminary post-FCS actions and identifies the challenges DOD and the Army must address as they proceed. This testimony is based on GAO's report on the Army's Ground Force Modernization effort scheduled for release March 15, 2010. It emphasizes the December 2009 decision to begin low-rate initial production for Increment 1 of the Brigade Combat Team Modernization.

The Army is implementing DOD direction and redefining its overall modernization strategy as a result of the Secretary of Defense's decision to significantly restructure the FCS program. It is transitioning from the FCS long-term acquisition orientation to a shorter-term approach that biannually develops and fields new increments of capability within capability packages. It now has an approved acquisition program that will produce and field the initial increment of the FCS spinout equipment, which includes unmanned aerial and ground vehicles as well as unattended sensors and munitions. It has preliminary plans for two other major defense acquisition programs to (1) define and develop follow-on increments and (2) develop a new Ground Combat Vehicle (GCV). The individual systems within Increments 1 and 2 are to be integrated with a preliminary version of an information network. Currently, the Army is continuing selected development work--primarily that related to Increments 1 and 2, and the information network--under the existing FCS development contract. The Army has recently released a request for proposals for the technology development phase of the proposed GCV development effort. The Army's projected investment in Increments 1 and 2 and GCV is estimated to be over $24 billion through fiscal year 2015. With these modernization efforts at an early stage, DOD and the Army face the immediate challenge of setting themon the best possible footing by buying the right capabilities at the best value. DOD and the Army have an opportunity to better position these efforts by utilizing an enhanced body of acquisition legislation and DOD policy reforms--which now incorporate many of the knowledge-based practices that GAO has previously identified--as well as lessons learned from the FCS program. Preliminary plans suggest the Army and DOD are strongly considering lessons learned. However, DOD recently approved the first of several planned low-rate initial production lots of Increment 1 despite having acknowledged that the systems and network were immature, unreliable, and not performing as required. That decision reflects DOD's emphasis on providing new capabilities quickly to combat units. This decision did not follow knowledge-based acquisition practices and runs the risk of delivering unacceptable equipment to the warfighter and trading off acquisition principles whose validity has been so recently underscored. The Army needs to seize the opportunity of integrating acquisition reforms, knowledge-based acquisition practices, and lessons-learned from FCS into future modernization efforts to increase the likelihood of successful outcomes.

« Return to search Government Accountability Office reports