Weekly Updates

LegiStorm is constantly adding new information on the people, places and reports in our database. In the past week, LegiStorm added:

  • 49 new people
  • 158 new organizations
  • 357 job history records for people in our database
  • 93 education records for people in our database
  • 127 contact addresses, emails and URLs (LinkedIn, Facebook, etc.)
  • 6 new people through the revolving door
  • 41 new policy reports
  • 67 new trips to our privately funded travel database
  • 97 new personal financial disclosures
  • 50733 new tweets
  • 7523 new press releases
 LegiStorm Blog
 SOCIAL MEDIA

 DEVBLOG
 IN THE NEWS

GAO Reports by subject "Contract modifications"

Full-text search of 42,668 reports from the Government Accountability Office

Full-text Search      Start Date Icon-cal      End Date Icon-cal

Title      Report or Bill No


Search Results:

Date Report No. Title
Oct. 28, 2010 GAO-11-60 Military Housing: Installations Need to Share Information on Their Section 801 On-Base Housing Contracts
United States Government Accountability Office GAO October 2010 Report to Congressional Committees MILITARY HOUSING Installations Need to Share Information on Their Section 801 On-Base Housing Contracts GAO-11-60 October 2010 MILITARY HOUSING Accountability • Integrity • Reliability Installations Need to Share Information on Their Section 801 On-Base Housing Contracts Highlights of GAO-11-60, ...
July 23, 2009 GAO-09-925T Capitol Visitor Center: Construction Expected to Be Completed within Current Budget Estimate
United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Thursday, July 23, 2009 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, House of Representatives CAPITOL VISITOR CENTER Construction Expected to Be Completed within Current Budget Estimate Statement of Terrell G. Dorn, Director, Physical Infrastructure Iss...
June 24, 2009 GAO-09-579 Contract Management: Minimal Compliance with New Safeguards for Time-and-Materials Contracts for Commercial Services and Safeguards Have Not Been Applied to GSA Schedules Program
United States Government Accountability Office GAO June 2009 Report to Congressional Committees CONTRACT MANAGEMENT Minimal Compliance with New Safeguards for Time-andMaterials Contracts for Commercial Services and Safeguards Have Not Been Applied to GSA Schedules Program GAO-09-579 June 2009 CONTRACT MANAGEMENT Highlights Highlights of GAO-09-579, a report to congressional committees Accountabili...
Sept. 25, 2008 GAO-08-1170R Federal User Fees: Improvements Could Be Made to Performance Standards and Penalties in USCIS's Service Center Contracts
United States Government Accountability Office Washington, DC 20548 September 25, 2008 Mr. Jonathan Scharfen Acting Director U.S. Citizenship and Immigration Services Subject: Federal User Fees: Improvements Could Be Made to Performance Standards and Penalties in USCIS’s Service Center Contracts Dear Mr. Scharfen: The Department of Homeland Security’s (DHS) U.S. Citizenship and Immigration Ser...
Sept. 24, 2008 GAO-08-1172T Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of September 24, 2008
United States Government Accountability Office GAO For Release on Delivery Expected at 11 a.m. EDT September 24, 2008 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, House of Representatives CAPITOL VISITOR CENTER Update on Status of Project's Schedule and Cost as of September 24, 2008 Statement of Terrell G. Dorn, Director, Physical Infrastructure Issues ...
July 8, 2008 GAO-08-900T Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of June 27, 2008
United States Government Accountability Office GAO For Release on Delivery Expected at 7:00 p.m. EDT Tuesday, July 8, 2008 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, House of Representatives CAPITOL VISITOR CENTER Update on Status of Project’s Schedule and Cost as of June 27, 2008 Statement of Terrell G. Dorn, Director, Physical Infrastructure Issue...
June 27, 2008 GAO-08-759 Telecommunications: Agencies Are Generally Following Sound Transition Planning Practices, and GSA Is Taking Action to Resolve Challenges
United States Government Accountability Office GAO June 2008 Report to the Committee on Homeland Security and Governmental Affairs, U.S. Senate TELECOMMUNICATIONS Agencies Are Generally Following Sound Transition Planning Practices, and GSA Is Taking Action to Resolve Challenges GAO-08-759 June 2008 TELECOMMUNICATIONS Highlights Highlights of GAO-08-759, a report to the Committee on Homeland Secur...
June 25, 2008 GAO-08-923T Military Construction: Kaiserslautern Military Community Center Project Continues to Experience Problems
United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, June 25, 2008 Testimony Before the Committee on Oversight and Government Reform, House of Representatives MILITARY CONSTRUCTION Kaiserslautern Military Community Center Project Continues to Experience Problems Statement of Gregory D. Kutz, Managing Director Forensic Audits and Special I...
May 22, 2008 GAO-08-811T Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of May 22, 2008
United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Thursday, May 22, 2008 Testimony before the Subcommittee on the Legislative Branch, Committee on Appropriations, House of Representatives CAPITOL VISITOR CENTER Update on Status of Project’s Schedule and Cost as of May 22, 2008 Statement of Terrell G. Dorn, Director, Physical Infrastructure Issu...
April 15, 2008 GAO-08-677T Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of April 15, 2008
United States Government Accountability Office GAO For Release on Delivery Expected at 1:30 p.m. EDT Tuesday, April 15, 2008 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, House of Representatives CAPITOL VISITOR CENTER Update on Status of Project’s Schedule and Cost as of April 15, 2008 Statement of Terrell G. Dorn, Director, Physical Infrastructure Is...
March 14, 2008 GAO-08-379 Defense Acquisitions: Termination Costs Are Generally Not a Compelling Reason to Continue Programs or Contracts That Otherwise Warrant Ending
United States Government Accountability Office GAO March 2008 Report to Congressional Committees DEFENSE ACQUISITIONS Termination Costs Are Generally Not a Compelling Reason to Continue Programs or Contracts That Otherwise Warrant Ending GAO-08-379 March 2008 DEFENSE ACQUISITIONS Highlights Highlights of GAO-08-379, a report to congressional committees Accountability Integrity Reliability Terminat...
March 12, 2008 GAO-08-545T Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of March 12, 2008
United States Government Accountability Office GAO For Release on Delivery Expected at 1:30 p.m. EST Wednesday, March 12, 2008 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, House of Representatives CAPITOL VISITOR CENTER Update on Status of Project’s Schedule and Cost as of March 12, 2008 Statement of Terrell G. Dorn, Director, Physical Infrastructure ...
Feb. 7, 2008 GAO-08-475T Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of February 7, 2008
United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EST Thursday, February 7, 2008 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, House of Representatives CAPITOL VISITOR CENTER Update on Status of Project's Schedule and Cost as of February 7, 2008 Statement of Terrell G. Dorn, Director, Physical Infrastructur...
Nov. 14, 2007 GAO-08-227T Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of October 31, 2007
United States Government Accountability Office GAO For Release on Delivery Expected at 9:00 a.m. EST Wednesday, November 14, 2007 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, House of Representatives CAPITOL VISITOR CENTER Update on Status of Project's Schedule and Cost as of October 31, 2007 Statement of Terrell G. Dorn, Director, Physical Infrastructu...
June 19, 2007 GAO-07-559 Defense Contracting: Use of Undefinitized Contract Actions Understated and Definitization Time Frames Often Not Met
United States Government Accountability Office GAO June 2007 Report to Congressional Committees DEFENSE CONTRACTING Use of Undefinitized Contract Actions Understated and Definitization Time Frames Often Not Met GAO-07-559 June 2007 DEFENSE CONTRACTING Highlights Highlights of GAO-07-559, a report to congressional committees Accountability Integrity Reliability Use of Undefinitized Contract Actions...
June 7, 2007 GAO-07-910T Polar-Orbiting Operational Environmental Satellites: Restructuring Is Under Way, but Challenges and Risks Remain
United States Government Accountability Office GAO For Release on Delivery Expected at 1 p.m. EDT Thursday, June 7, 2007 Testimony Before the Subcommittee on Energy and Environment, House Committee on Science and Technology POLAR-ORBITING OPERATIONAL ENVIRONMENTAL SATELLITES Restructuring Is Under Way, but Challenges and Risks Remain Statement of David A. Powner, Director Information Technology Ma...
April 27, 2007 GAO-07-498 Polar-Orbiting Operational Environmental Satellites: Restructuring Is Under Way, but Technical Challenges and Risks Remain
United States Government Accountability Office GAO April 2007 Report to Congressional Requesters POLAR-ORBITING OPERATIONAL ENVIRONMENTAL SATELLITES Restructuring Is Under Way, but Technical Challenges and Risks Remain GAO-07-498 April 2007 Highlights Highlights of GAO-07-498, a report to congressional requesters Accountability Integrity Reliability POLAR-ORBITING OPERATIONAL ENVIRONMENTAL SATELLI...
Aug. 8, 2003 GAO-03-727 DOD Contract Payments: Management Action Needed to Reduce Billions in Adjustments to Contract Payment Records
United States General Accounting Office GAO August 2003 Report to the Chairman, Committee on the Budget, House of Representatives DOD CONTRACT PAYMENTS Management Action Needed to Reduce Billions in Adjustments to Contract Payment Records GAO-03-727 a August 2003 DOD CONTRACT PAYMENTS Management Action Needed to Reduce Billions in Adjustments to Contract Payment Records Highlights of GAO-03-727, a...
July 26, 2001 GAO-01-697 Canceled DOD Appropriations: $615 Million of Illegal or Otherwise Improper Adjustments
United States General Accounting Office GAO July 2001 Report to Congressional Requesters CANCELED DOD APPROPRIATIONS $615 Million of Illegal or Otherwise Improper Adjustments GAO-01-697 Contents Letter Results in Brief Background Contract Reconciliation $615 Million of Adjustments Were Illegal or Otherwise Improper Contract Reconciliation Process Lacks Certain Fundamental Controls Contract Modific...
April 30, 2001 GAO-01-513 Defense Health Care: Continued Management Focus Key to Settling TRICARE Change Orders Quickly
United States General Accounting Office GAO April 2001 Report to the Chairman and Ranking Minority Member, Subcommittee on Military Personnel, Committee on Armed Services, House of Representatives DEFENSE HEALTH CARE Continued Management Focus Key to Settling TRICARE Change Orders Quickly GAO-01-513 Contents Letter Appendix I Scope and Methodology 1 22 Appendix II Prior Initiatives to Address Chan...
April 26, 2001 GAO-01-544T FTS 2001: Contract Transition Delays and Their Impact on Program Goals
United States General Accounting Office GAO For Release on Delivery Expected at 2 p.m. Thursday, April 26, 2001 Testimony Before the Subcommittee on Technology and Procurement Policy, Committee on Government Reform, House of Representatives FTS2001 Contract Transition Delays and Their Impact on Program Goals Statement of Linda D. Koontz Director, Information Management Issues GAO-01-544T Mr. Chair...
April 26, 2001 GAO-01-576R Science, Space, and Technology: International Space Station Propulsion Module Procurement Process
United States General Accounting Office Washington, DC 20548 April 26, 2001 The Honorable John McCain Chairman The Honorable Ernest F. Hollings Ranking Member Committee on Commerce, Science, and Transportation United States Senate The Honorable Sherwood L. Boehlert Chairman The Honorable Ralph M. Hall Ranking Minority Member Committee on Science House of Representatives Subject: International Spac...
May 12, 2000 NSIAD-00-177R Defense Acquisitions: Medium Tactical Vehicle Replacement Contract Issues
United States General Accounting Washington, DC 20548 Office National Security and International Affairs Division B-285332 May 12,200O The Honorable Rick Santorum United States Senate Subject: Defense Acquisitions: Medium Tactical Vehicle Replacement Contract Issues Dear Senator Santorum: In response to your March 29,2000, letter, we reviewed issues related to the Army’s Medium Tactical Vehicle ...
May 11, 2000 NSIAD-00-103R Space Station: Prime Contract Changes
States General Accounting Washington, DC 20548 United Office National Security and International Affairs Division B-28472 1 May 11,200O The Honorable F. James Sensenbrenner, Jr. Chairman The Honorable Ralph M. Hall Ranking Minority Member Committee on Science House of Representatives Subject: &ace Station: Prime Contract Changes The National Aeronautics and Space Administration (NASA) and its inte...
April 14, 2000 T-NSIAD-00-140 Contract Management: DOD's Anthrax Vaccine Manufacturer Will Continue to Need Financial Assistance
United States General Accounting Office GAO For Release on Delivery Expected at 1:00 p.m., CDT Friday, April 14, 2000 Testimony Before the Subcommittee on Personnel, Committee on Armed Services, U.S. Senate CONTRACT MANAGEMENT DOD’s Anthrax Vaccine Manufacturer Will Continue to Need Financial Assistance Statement of David E. Cooper, Associate Director Defense Acquisition Issues National Security...
Oct. 27, 1999 NSIAD-00-15 Defense Acquisitions: Army Purchased Truck Trailers That Cannot be Used as Planned
United States General Accounting Office GAO October 1999 Report to the Honorable Tom Harkin, U.S. Senate DEFENSE ACQUISITIONS Army Purchased Truck Trailers That Cannot Be Used as Planned GAO/NSIAD-00-15 United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-283452 October 27, 1999 The Honorable Tom Harkin United States Senate Dear Sena...
Jan. 13, 1999 NSIAD-99-26 Army Medium Trucks: Information on Delivery Delays and Corrosion Problems
United States General Accounting Office GAO January 1999 Report to the Honorable Tom Harkin, U.S. Senate ARMY MEDIUM TRUCKS Information on Delivery Delays and Corrosion Problems GAO/NSIAD-99-26 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-281385 January 13, 1999 The Honorable Tom Harkin United States Senate Dear Senator H...
March 10, 1998 NSIAD-98-67 F-22 Aircraft: Progress in Achieving Engineering and Manufacturing Development Goals
United States General Accounting Office GAO March 1998 Report to Congressional Committees F-22 AIRCRAFT Progress in Achieving Engineering and Manufacturing Development Goals GAO/NSIAD-98-67 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-278307 March 10, 1998 Congressional Committees As required by the National Defense Autho...
July 14, 1997 HEHS-97-141 Defense Health Care: Actions Under Way to Address Many TRICARE Contract Change Order Problems
United States General Accounting Office GAO July 1997 Report to the Chairman and Ranking Minority Member, Subcommittee on Military Personnel, Committee on National Security, House of Representatives DEFENSE HEALTH CARE Actions Under Way to Address Many TRICARE Contract Change Order Problems GAO/HEHS-97-141 GAO United States General Accounting Office Washington, D.C. 20548 Health, Education, and Hu...
June 24, 1997 HEHS-97-149R Health: TRICARE Administrative Prices in the Northwest Region May Be Too High
GAO United States General Accounting Office Washington, D.C. 20548 Health, Education and Human Services Division B-276227 June 24, 1997 The Honorable William S. Cohen The Secretary of Defense . . ‘ve Subject: TRICARE Adnumstrau Prices in the Northwest Region Mav Be Too liifzhDear Mr. Secretary: The Department of Defense (DOD) initiated TRICARE-its nationwide managed health care program-to improv...
April 3, 1997 AIMD-97-69R DOD Problem Disbursements: Contract Modifications Not Properly Recorded in Payment System
GAO United States General Accounting Office Washington, D.C. 20548 Accouuting and Information Management Division B-273000 April 3,x397 Mr. Charles R. Coffee, Director Defense Finance and Accounting Service, Columbus Center P.O. E3ox182317 East 5th Avenue Columbus, Ohio 43.2182317 Subject: DOD Problem Disbursements: Contract Modifications Not Properly Recorded in Pavment Svstem Dear Mr. Coffee: Th...
Oct. 31, 1996 RCED-97-14 Timber Management: Opportunities to Limit Future Liability for Suspended or Canceled Timber Sale Contracts
United States General Accounting Office GAO October 1996 Report to the Chairman, Subcommittee on Forests and Public Land Management, Committee on Energy and Natural Resources, U. S. Senate TIMBER MANAGEMENT Opportunities to Limit Future Liability for Suspended or Canceled Timber Sale Contracts G A O years 1921 - 1996 GAO/RCED-97-14 GAO United States General Accounting Office Washington, D.C. 20548...
Aug. 9, 1996 HEHS-96-188R Veterans Affairs: VA Construction Contract Award Delays
GAO United GeneralAccounting Office Washington,D.C.20648 Health, Education and Human Services Division States B-272207 August 9, 1996 The Honorable Christopher S. Bond Chairman The Honorable Barbara A. Mikulski Ranking Minority Member Subcommittee on VA, HUD, and Independent Agencies Committee on Appropriations United States Senate The Honorable Jerry Lewis Chairman The Honorable Louis Stokes Rank...
July 24, 1996 T-NSIAD-96-210 Space Station: Cost Control Difficulties Continue
United States General Accounting Office GAO For Release on Delivery Expected at 9:30 am, EDT Wednesday, July 24, 1996 Testimony Before the Subcommittee on Science, Technology, and Space, Committee on Commerce, Science and Transportation, United States Senate SPACE STATION Cost Control Difficulties Continue Statement of Thomas J. Schulz, Associate Director, Defense Acquisitions Issues, National Sec...
May 3, 1996 AIMD-96-63 Financial Management: BIA's Tribal Trust Fund Account Reconciliation Results
United States General Accounting Office GAO May 1996 Report to the Committee on Indian Affairs, U.S. Senate FINANCIAL MANAGEMENT BIA’s Tribal Trust Fund Account Reconciliation Results G A O years 1921 - 1996 GAO/AIMD-96-63 GAO United States General Accounting Office Washington, D.C. 20548 Accounting and Information Management Division B-266127 May 3, 1996 The Honorable John McCain Chairman The H...
March 28, 1996 T-NSIAD-96-137 C-17 Aircraft: Comments on Air Force Request for Approval of Multiyear Procurement Authority
United States General Accounting Office GAO For Release on Delivery Expected at 2:30 p.m., EST Thursday March 28, 1996 Testimony Before the Subcommittee on Seapower, Committee on Armed Services, U.S. Senate C-17 AIRCRAFT Comments on Air Force Request for Approval of Multiyear Procurement Authority Statement of Louis J. Rodrigues, Director, Defense Acquisitions Issues, National Security and Interna...
Nov. 29, 1995 T-RCED-96-38 Forest Service: Observations on the Emergency Salvage Sale Program
United States General Accounting Testimony Office Before the Subcommittee on Forests and Public Lands Management, Committee on Energy and Natural Resources United States Senate and the Timber Salvage Task Force, Resources Committee, Mouse of Representatives For Release on Delivery Expected at 9:30 a.m. EDT Wednesday November 29, I995 James K. Meissner, Associate Director Natural Resources Manageme...
Oct. 27, 1995 RCED-96-33R Government Operations: Data on EPA's Contracts
United States General Accounting Office Washington, D.C. 20848 Resources, Comumnity, Eeonoude Developmeut and Division B-270307 October 27, 1995 The Honorable Lauch Faircloth Chairman, Subcommittee on Clean Air, Wetlands, Private Property, and Nuclear Committee on Environment and Public Works United States Senate Dear Mr. Chairman: Safety This interim report responds to your request for an assessm...
Sept. 19, 1995 HEHS-95-273R Veterans Affairs: VA Clinic Funding
GAO United States General Accounting Office Washington, D.C. 20648 Health, Education and Human Services Division B-266172 September 19, 1995 The Honorable Christopher S. Bond Chairman, Subcommittee on VA, HUD, and Independent Agencies Committee on Appropriations United States Senate Dear Mr. Chairman: the Department of Veterans Affairs (VA) Last February, encouraged its medical centers to employ a...
Jan. 31, 1995 RCED-95-2 Tongass Timber Reform Act: Implementation of the Act's Contract Modification Requirements
United States General Accounting Office GAO January 1995 Report to the Ranking Minority Member, Committee on Resources, House of Representatives TONGASS TIMBER REFORM ACT Implementation of the Act’s Contract Modification Requirements GAO/RCED-95-2 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-253175 January 31, 1995 T...
Jan. 12, 1995 RCED-95-65 Naval Petroleum Reserve: Opportunities Exist to Enhance Its Profitability
United States General Accounting Office GAO January 1996 Report to the Committee on Armed Services, U.S. Senate NAVAL PETROLEUM RESERVE Opportunities Enhance its Profitability Exist to ” GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-259495 January 12,1995 The Honorable Strom Thurmond Chairman The Honorable Sam Nunn Ra...
Dec. 30, 1994 NSIAD-95-40 NASA Procurement: Contract and Management Improvements at the Jet Propulsion Laboratory
United States General Accounting Office GAO December 1994 Report to Congressional Requesters NASA PROCUREMENT Contract and Management Improvements at the Jet Propulsion Laboratory GAO/NSIAD-95-40 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-259019 December 30, 1994 The Honorable John Glenn Chairman, Committee on Governmen...
Nov. 14, 1994 GGD-95-1 Resolution Trust Corporation: Better Data Could Improve Effectiveness of Nonperforming Loan Auctions
United States General Accounting Office GAO November 1994 Report to the Deputy and Acting Chief Executive Officer, Resolution Trust Corporation RESOLUTION TRUST CORPORATION Better Data Could Improve Effectiveness of Nonperforming Loan Auctions GAO/GGD-95-1 GAO United States General Accounting Office Washington, D.C. 20548 General Government Division B-257808 November 14, 1994 Mr. John E. Ryan Depu...
Aug. 18, 1994 NSIAD-94-179 NASA Procurement: Challenges Remain in Implementing Improvement Reforms
GAO/NS&Ab-94-179 ‘ , GAO United States General Accounting Office Washington, D.C. 20548 National Security International B-257226 August l&l994 and Affairs Division The Honorable John Conyers, Jr. Chairman, Committee on Government Operations House of Representatives Dear Mr. Chairman: This report responds to your request that we review the status of the National Aeronautics and Space Administrati...
June 27, 1994 GGD-94-145 General Services Administration: Better Data and Oversight Needed to Improve Construction Management
United General Accounting Office GAO June 1994 Report to the Administrator, General Services Administration ~%EMERAL ,%EMERALSERVICES ~JQI~NIS~~TI(-JN Ovehght Needed to Improve Construction Management c GAWGGD-94-146’ GAO United States Office D,C. 20548 General Accounting Washington, General Government Division B-25629 1 June 27,1994 The Honorable Roger W. Johnson Administrator General Services ...
July 15, 1993 T-NSIAD-93-19 Defense Management: Printing Operations at the Department of Defense
United States General Accounting Office Irtq
July 15, 1993 NSIAD-93-178 NASA Procurement: Proposed Changes to the Jet Propulsion Laboratory Contract
United States General Accounting Office GAO July 1993 Report to Congressional Requesters NASA PROCUREMENT Proposed Changes to the Jet Propulsion Laboratory Contract GAO/NSIAD-93-178 GAO United States General Accounting Offke Washington, D.C. 20648 National Security and International Affairs Division B-253238 July 15,1993 The Honorable John Glenn Chairman, Committee on Governmental Affairs United S...
July 1, 1993 NSIAD-93-192R National Defense: C-17 Program
. GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-253494 July 1, 1993 The Honorable Sam Nunn Chairman, Committee on Armed Services Unites States Senate The Honorable Strom Thurmond Ranking Minority Member Committee on Armed Services United States Senate In its report on the National Defense Authorization Act for Fiscal Year ...
Feb. 22, 1993 NSIAD-93-108 Army Acquisition: Effective Subcontractor Oversight Needed Before Longbow Apache Production
ARMY ACQUISITION Effective Subcontractor Oversight Needed Before Longbow Apache Production 148844 RESTRICTED--Not to be released General Accounting Office unkss approved by the Offxce of Co Relations. SSd w -- outside the mecificalls (;A(‘,/NSIAI)-!):3-108 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-261849 February 22,...
Sept. 18, 1992 RCED-92-282R Natural Resources: Tribal Management of Mission Valley Power
GAO l’nited States General Accounting Offwe Washington, D.C. 20518 /s-i3 5Q 7 ResourcesI Community, Economic Development and Division B-249056 September 18, 1992 The Honorable Ron Marlenee House of Representatives Dear Mr. Marlenee: YOU requested that we provide information on the contracts between the Confederated Salish and Kootenai Tribes and the Department of the Interior's Bureau of Indian ...
First Previous 1 2 3 4 Next Last
 181 results

« Return to search Government Accountability Office reports